隐私权政策

Hotel Design Management (I)– The main purpose, function and important work content of hotel design management

Hotel Design Management (I)— The main purpose, function and important work content of hotel design management

Owners do not attach importance to hotel design management is the biggest irresponsibility of the project

In the process of building a hotel project, there have been hotel owners who think that there are design consultants who have become  “second-hand”  friends please raise their hands. Well, maybe you and we often hear the hotel owner say: how can a certain design consultant become a “second passer”  at this stage. Hotel owners often ignore that they may have become a “second passer” before the consultant unit.

Hotel design plays an important role in the image of the hotel or the hotel’s late operating capacity, and even affects the completion of the hotel project and directly affects the success or failure of the hotel project. The importance of hotel design has also been recognized and valued by hotel investors, but many projects are operated, some hotel owners’ management teams failed to recognize this importance, so many hotel owners or hotel owners dare not let go of one of the main reasons.

As a team of hotel preparation, we need to fully understand how hotel design and management to do and how to do well. During this time, you will systematically share the content of hotel design management, and welcome to discuss with colleagues the work and methods of hotel design management.

Let’s start with the concept of hotel design management, and then we’ll start with each other.

The main purpose of hotel design management

According to the functional requirements and design effects required by different hotel brands, the engineering cost of allocating different locations can be optimized.

The construction scale, function, equipment level, design standard, design effect, design modeling, and construction technology of hotel construction are determined, so as to determine the investment of hotel construction. Through the design phase of the project management, to ensure the validity and continuity of documents, in line with the relevant laws, regulations, and regulations of the country, and timely access to the relevant approval documents, fully meet the purpose of the hotel project, requirements, and prayers.

The main functions of design management

Hotel design management, mainly for hotel design and cost control management and hotel design procedures, design review, design specifications, design processes, hotel functional facilities, mechanical and electrical equipment, technical measures to manage.

According to the design purpose, design progress, and project cost control requirements of the hotel, the organization of each consulting unit set up a project design management group to carry out the project design procedures, design specifications, design performance, and design implementation of the drawing review and hotel design and construction work.

Coordinate the design consulting units and do a good job in the design stage of the work task release, design results control, design results optimization, design key time node control.

Design management is an important task

Management and hotel project preparation related to the consultant unit to discuss matters that may affect the project design, including municipal support and other aspects of facilities. Analysis and discussion of the hotel facilities;

cooperate with and manage the special inspection or feasibility study of the site necessary for the relevant departments and units to prepare the hotel;

Study the planning information of hotel projects and the design requirements provided by hotel management companies, combined with the specific characteristics of hotel projects and the needs of different functional spaces, study feasible hotel design solutions;

Management and with the hotel design plan comparative analysis, need to consider the technical features of the program, initial investment costs, and operating costs and other important content, and make recommendations;

The design phase of the overall drawing management: according to national standards and the project area of the specification requirements and Party A requirements, to provide in line with the depth of the design drawings, for the design review and with the construction drawing design units.

For the hotel design, preliminary design, construction drawing design work (including architecture, structure, mechanical and electrical majors), exterior decoration design, interior public parts design, and the whole project design work is responsible.

The selection of all materials, equipment color, and so on related to the hotel project, the equipment, materials selected in the design analysis, comparison, rationalization proposals.

All the drawings required for the hotel’s approval, and the corresponding adjustments and amendments according to the results of the approval, to meet the final approval requirements.

To handle the communication and coordination of the various design consultants working on the hotel project.

Responsible for the confirmation, modification, and adjustment of related parts related to design changes in the construction process.

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.

12345