隐私权政策

Standard Desk Manual for Property Engineering Supervisors(2021 Promotion).

Directory

Project 1 Property Takeover Acceptance

Section 1 Key Interpretations

Point 01:Train engineering personnel who take part in the acceptance

Point 02:Engineering professionals should enter the site early

Point 03:Acceptance tools and materials should be fully prepared

Point 04:The handover and acceptance of information should not be taken lightly

Point 05:The problems identified by the early intervention should be the focus of the acceptance

Point 06:It is important to insist on qualifying one to take over one

Point 07:Nonconformity issues should be dealt with in a timely manner

Point 08:The acceptance of the outstanding construction must be signed legal documents

Point 09:Protect the finished product of the facility before entering the group after acceptance

Point 10:The end of the warranty period should be clearly filled in

Section II Workflow

Process 01:Property detail quality inspection workflow

– Process 02:Physical part acceptance process

Process 03:The data section is handed over to the workflow

Section III Job documents (take over acceptance).

Document 01:Property Details Inspection Management Operations Guidelines

Document 02:Property Engineering Details Quality Inspection Program

File 03:Notice of quality correction

File 04:Quality Issues Record Form

File 05:Central air conditioning system quality checklist

File 06:Outdoor companion quality checklist

File 07:Water pipe stress test quality checklist

File 08:Gas closure test quality checklist

File 09:Roof part quality checklist

File 10:Granite Ground Quality Checklist

File 11:Paint Quality Checklist for Process colors

Document 12:Quality Checklist for Greening Trees Planting Project

Section 4 Troubleshooting

Question 01:What conditions must be met for property acceptance?

Question 02:What should be rejected for acceptance

Question 03:What technical information should the developer be required to provide when taking over acceptance

Question 04:Acceptance should require the contractor to provide what operation and maintenance manual

Question 05:What are the methods for property engineering to undertake inspection?

Question 06:What are the causes of the quality problems of property projects?

Question 07:How to deal with the problems found in undertaking inspections

Q08:Who is responsible for repairs after the warranty expires

Item 2  Occupancy decoration management

Section 1 Key Interpretations

Point 01:To clarify the engineering personnel’s responsibility for the inspection of the house

Point 02:To prepare the inspection material

Point 03:Timely resolution of the owners in the acceptance of the issue

Point 04:Anticipate possible situations in the house and respond positively

Point 05:Do a good job of engineering warranty management

Point 06:To review the decoration drawings

Point 07:To strengthen the management of decoration materials supplies

Point 08:The renovation construction process should be monitored

Point 09:Regular inspection of the renovation site

Point 10:To prevent illegal decoration

Point 11:Renovation violations are dealt with in a timely manner

Point 12:Careful acceptance, no hidden dangers

Point 13:Remind the owner to eliminate indoor odors at the end

Section 2 Job flow

Process 01:Owner-owned property maintenance process

— Process 02:Common equipment Facility maintenance process

Process 03:Owner renovation approval process

Section III Job file

File 01:During the new building into the group inspection work specifications

Document 02:Engineering Department decoration inspection regulations

Document 03: House inspection submissions

Document 04:Building handover registration form

Document 05:House (indoor) acceptance handover form

File 06:House Repair Record Sheet

File 07:Home Repair Notice

File 08: House Repair Reminder

File 09:Renovation Commitment

File 10:Responsibility for Fire Prevention

File 11:Temporary Fire Application Form

Document 12:Application form for temporary electricity plan

Document 13:Application form for temporary water plan

Document 14:Renovation construction permit

File 15:Renovation site inspection record

File 16:Interior decoration violation record form

Document 17:House (indoor) decoration acceptance form

Section 4 Troubleshooting

Question 01: What is the focus of the house inspector during the joining period?

Question 02:How to do a good job of engineering warranty management

Question 03:How to understand the owner’s true intention of decoration

Question 04:What formalities should the decoration unit go to the engineering department?

Question 05:How to manage the construction of water and electric lines

Question 06:How to prevent the structural transformation of the owner

Question 07:What advice should be made for the owner’s flooring and floor tile laying

Question 08:How to manage the construction of the owner’s sewer pipe and flue

Question 09:How to manage the owner’s carpentry construction

Question 10:How to manage the owner’s paint construction

Question 11:What are the contents of the second decoration inspection?

Project 3  Daily maintenance of facilities and equipment

Section 1 Key Interpretations

Point 01:Establish a facility ledger

Point 02:Develop a reasonable operating plan

Point 03:Provide a good operating environment

Point 04:Establish the necessary rules and regulations

Point 05:Equipped with qualified operations managers

Point 06:Clarify the technical responsibilities of individual professionals

Point 07:Do a good job of maintaining the system

Point 08:Strengthen the state management of facility equipment

Section II Workflow

Process 01:Infrastructure and work environment management processes

Process 02:Normal maintenance of the equipment

Process 03:Equipment emergency repair process

Process 04:Electrical and mechanical equipment management process

Process 05:Fire alarm signal processing process

Process 06:Elevator troubleshooting process

Process 07:Constant pressure variable frequency living water supply system operating process

Process 08:Low-voltage power distribution equipment repair and maintenance process

Section III Job file

Document 01:Regulations on the Management of Electrical and Mechanical Equipment Facilities

File 02:Power distribution room operation management regulations

File 03:Emergency generator set operation management regulations

File 04:Elevator (ladder) operation management regulations

File 05:Central air conditioning operation management regulations

File 06:Fire linkage system operating procedures

File 07:Pump Operation Regulations

File 08:Equipment registration form

Document 09:Approval form for maintenance of electrical and mechanical equipment facilities

File 10:Action ticket

File 11:Power distribution room run inspection records

File 12:Power distribution equipment operation record

File 13:Power distribution room inspection maintenance record sheet

File 14: Electric room fault record table

File 15:Emergency generator operation record

File 16:Emergency generator inspection records

File 17:Generator set fault record

File 18:Generator maintenance record sheet

File 19:Elevator Run Inspection Record

File 20:Elevator Fault Handling Record Form

File 21:Elevator maintenance record sheet

File 22:Fire linkage system inspection records

File 23:Fire linkage system failure (or alarm) processing record sheet

File 24:Pump room operation inspection record

File 25:Pump fault handling record sheet

File 26:Water pump room maintenance record

Document 27:Parts replacement and equipment large, medium repair plan

File 28:Device Tour Record Sheet

Section 4 Troubleshooting

Q01:What are the requirements for filling out the account of property equipment and facilities?

Q02:How to manage the account of property equipment and facilities

Q03:How to determine the shutdown plan for facility equipment

Question 04:Determine what issues to consider when starting a device startup plan

Question 05:Which contingency plans should be developed?

Question 06:How to troubleshoot and coordinate facility equipment

Q07:How to implement the facility equipment maintenance plan

Project IV  House body maintenance management

Section 1 Key Interpretations

Point 01:Do a good job of safety inspection of the house under management

Point 02:Sporadic conservation should be taken seriously

Point 03:Planned maintenance should be carried out on a predetermined period

Point 04:Establish a housing inspection system and a reporting system

Point 05:Do a good job of housing survey and identification work

Point 06: House damage rating

Point 07:The management of dangerous housing should be strengthened

Section II Workflow

Process 01:The owner’s home for their own use and facilities equipment repair (warranty period) process

Process 02:Owner’s home for their own use and facilities and equipment repair (out-of-warranty) process

Process 03:Home commons and utility equipment reporting (off-warranty) process

Process 04:The process of reporting for repair (warranty period) of facilities and equipment in common parts of the house and public areas

Process 05:The renovation process for the main house facility

Section III Job file

Document 01:Housing maintenance regulations

File 02:House Body Maintenance Management Plan and Implementation Plan

Document 03: House damage rating Assessment implementation management measures

File 04:(Large) repair schedule in the house

File 05:Daily checklist of common parts of the house body

File 06:Daily checklist for shared facility equipment

File 07:Sporadic minor repair records of housing facilities

File 08:Home Facility Maintenance Record Form

Document 09:Maintenance Fund Use Approval Form

File 10:Report form on the use of the Housing Body Maintenance Fund

File 11:Housing Body Maintenance Fund Account

File 12:Houses Are Divided Into Damage Ratings

File 13: House Damage Level Summary

File 14:Company Home Damage Rating Summary

File 15:House Integrity Statistics Table

Section 4 Troubleshooting

Question 01:House maintenance management can be divided into several stages of work

Question 02:How to collect minor repair maintenance items

Q03:How to prepare a housing maintenance plan

Question 04:How to implement the housing maintenance task

Question 05:How to do a good job of foundation maintenance

Question 06:How to do a good job in the maintenance of the floor works

Question 07:How to do a good job in the maintenance of wall countertops and ceiling works

Question 08:How to do a good job in the maintenance of doors and windows projects

Question 09:How to do a good job of roofing maintenance

Question 10:How to do a good job in the maintenance and management of ventilation ducts

Question 11:How to calculate the rate of house integrity, risk rate

Question 12: What should be done to rate the damage to the house?

Question 13:How to organize and carry out the house survey

Question 14:How to do a good job of the housing damage level of the summary statistics

Question 15:How to control the quality of the house damage rating

Item 5  Daily maintenance services

Section 1 Key Interpretations

Point 01:Schedule the owner’s daily maintenance 

Point 02:Develop a commitment to repair services

Point 03:Clarify repair service procedures and basic requirements

Point 04:Establish a system of three inspections and three visits

Section II Workflow

Process 01:Engineering repair process

Process 02:Daily maintenance workflow

Process 03:Repair the reception language process

Process 04:On-site repair language process

Section III Job file

File 01:Repair service commitment

File 02:The operating requirements for the service order

File 03:Customer Repair Service Management Regulations

File 04:Public service procedures

Document 05:Inspection of the repair process

File 06:Repair service standards

Document 07:Owners report for registration

File 08:Repair business dispatch

File 09:On-site repair record sheet

Document 10:Engineering Paid Service Registration Form

File 11: Zero Repair Timely Rate Statistics Table

Document 12:Public Maintenance Registration Form of the Ministry of Engineering

Section 4 Troubleshooting

Q01:How to get equipment repair information

Question 02:How to repair walls and roofs (plasterboard base).

Q03:How to replace floor or wall tiles, tiles

Q04:How to replace the exterior wall, ground mosaic

Question 05:How to plug holes in the basement wall

Question 06:How to repair damaged sidewalks and driveways

Question 07:How to repair cracked walls and floors

Issue 08:How to fix a broken step

Question 09:How to patch the plaster layer

Question 10:How to repair the seepage wall

Q11:How to repair a roofing pool (or water tank).

Question 12:How roofing leaks (rigid roofing).

Q13:How to repair doors and windows

Q14:How to change the lock (wooden door, iron door).

Q15:How to troubleshoot the power distribution room switch

Question 16:What to do without electricity in a household

Item 6 Energy saving and consumption reduction management

Project 7 Departmental affairs communication and coordination

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.

12345