隐私权政策

Project description process

How can bidding for tens of millions of construction projects be destroyed on the tender? The way to fix the label is all here!

For tenders / tenders, nothing is more painful than working overtime to stay up late to make tenders, the site less than 2 minutes to scrap. We have studied many cases of tender failure, found that most of the “abandoned bid”  is due to  “insufficient in-depth study of tender documents, unclear grasp of the focus of the tender, the company team professionalism reflects insufficient, the details of mishandling”  resulting in the scrapping of the bid.

What should I do with a good label plan?

Why are so many large-scale companies bidding “ repeatedly in the middle of the project “?

What is the most important “bonus item” for Party A?  

How to do a good job of the description? Let’s talk to you about the following:

The whole process of project description is explained from the following aspects

First, the project management team structure

Project team architecture diagram

The professional competence of the project team is reflected

Second, the project overview

The overall project understanding and the company’s attention, management objectives

Third, combined with drawings and the scene to do a good job of early deepening work

Deepening thinking and direction

Drill down nodes and big samples

Deepen the integration point

Fourth, the construction of key difficulties analysis and solution measures

Several key difficulties are analyzed according to the characteristics of the project (in this issue we take the anti-cracking, anti-aircraft drum, anti-leakage as examples in ‘Three Defenses’).

Fifth, professional and technical support

Application of 3D scanning technology

Lighting design

The use of BIM systems

The use of remote monitoring

Six, emphasize the total package with management

Project resource integration

Coordinate subcontracting

Seven, construction progress, quality, safety management ideas

Project management process

Safe and civilized management

Progress management

quality control

Eight, the company’s service support for the project

Support from the management team

Technically qualified management support

With these aspects in hand, let’s share a set of “Report Success Stories” withyou.

01

Management structure

My company will send the company’s leadership supervision, and sent my company decoration experience is extremely rich, and has similar performance decoration projects such as xxxx international hotel decoration engineering construction experience xxx as the executive project manager, the professional knowledge of the first-level mechanical and electrical builder xxx as executive manager, won the Luban Award project xxxx  Xxx, a supporting project, leads the entire project management team as the project manager to undertake the construction of the project.

Management personnel structure

02

Engineering overview

The xxx project is the first to enter a first-tier city in southern China and is of great significance to your strategic layout. Division I attaches great importance to this project, the company set up a special working group at the top, and assigned a first-class level, with relevant rich experience of the lean team to manage the implementation.  Strive for the two sides of the first project cooperation to create a boutique project.

03

Deepen the design and management system

1, deepen the overall design ideas and direction

Analyze the key difficulties of the project construction, organize the list of problems, and finally, by deepening the design of 3D modeling optimization, the development of construction plans, the implementation of technical bottom.

2, deepen the design of the purpose and requirements

Drawing deepening process: clear completion surface size, grass-roots finish surface size, grass-roots materials, different material interface closing relationship, different materials grass-roots finish face control size.  

Under the premise of fully understanding the design intention, perfect the ominous, unworkable and unreasonable node closing scheme of the construction drawings.

According to the node closing drawings drawn above, the corresponding grass-roots practices and clear grass-roots materials (the types of sheets can be distinguished according to the pattern fill).

Comprehensive cloth point mapping, for multi-professional coordination and orderly construction to create conditions, integrated cloth points are divided into wall ground cloth points and top surface integrated cloth points.

04

Construction key difficulties analysis and solution measures

Several important key points control in the construction process of the project, according to our experience in construction management, which is very important difficulty control here is summarizedas ”three defense’,’three defense’  in the anti-cracking, anti-aircraft drum, anti-leakage can be said to be the most important for the construction  process.

1, wall cracking smallpox cracking why is difficult to solve?

Wall paint cracking, top corner cracking is the most important quality control point of fine decoration, fine decoration wall top surface is a large area of latex paint finish, if the grass-roots slightly improper construction, will cause a large area cracking, resulting in a large phenomenon of rework, is a great loss to the project.

First of all, whether the top surface cracking or wall cracking, one of the common external causes of their cracking is, after the construction of the building settlement is stable? Is the junction processing of civil secondary structure reasonable?

“Settling”  is the vertical deformation or subsidence of the foundation soil caused by compression under the action of building load.  

Uneven settlement is more harmful to the building, will cause additional stress on the building and cause cracks, and even local components break, endangering the safety of the building, etc. , the project department should get the relevant departments before the project building subsidence observation data, to ensure that it will not affect the decoration construction can be carried out normally.

In addition to external factors, the elements that effectively control the cracking of the wall, let’s talk to you about 3 points.

(1) To solve the material’s own shortcomings: such as the lack of adhesion of the grass-roots material, the surface base material is too dry, wet, or the wall base material is too smooth, cement mortar raw materials are not qualified and so on.

2, the standard construction process is improper: such as improper bottoming in the construction, wall plastering did not according to the requirements of the net processing, super-thick plaster not secondary hanging net, not timely water conservation and so on.

3, do a good job in the construction site environmental maintenance: multi-job simultaneous work when the uncoordinated decorative construction process errors, interference with each other, resulting in the wall has completed the ash layer by the surrounding construction operations to shock, impact, fracking, cracking,  so the protection of finished products need timely maintenance.

And you summarize the preventive measures mentioned above, in terms of materials, construction details, thinking map content more detailed:

2, the owner likes to use glass brick, but empty drum problem how to do?

In hardcover  repair projects, glass brick is often the owner’s priority surface materials, but because glass brick construction is prone to empty  drums, shedding and other phenomena, but also over the years decoration works a piece of heart disease.

It is divided into three main areas:

(1) From the material properties, grass-roots treatment, construction points and what you analyze as what glass brick difficult to bond, easy to produce empty drum, shedding, arch cracking and other common causes of quality.

(2) Understand the “Difference between glass tiles and ordinary tiles” “The difference between tile binders and cement mortar” “Adhesives, back glues, sewing agent selection”.

(3) 7 aspects of the construction points analysis, respectively, the sticker control points, grass-roots treatment, adhesive treatment, method analysis, seam retention treatment, construction environment requirements and technical management processes;

About the glass brick quality empty drum problem, below and you summarize the glass brick empty drum prevention key nodes:

3, bathroom area how to pre-control the “leak”   problem?

Waterproofing project is an important part of construction engineering, especially the quality of toilet waterproofing project, directly affect the life of buildings and structures, follow-up rework, maintenance bring endless distress.

In the actual waterproofing project, the effect of construction operation factors on the quality of waterproof layer is becoming more and more significant

If the grass-roots treatment, waterproof paint mixing, coating, maintenance and other aspects of improper treatment, it is very easy to appear waterproof layer cracking, foaming, pinholes, peeling, powdering, breakage and other issues, to the waterproof layer quality has a great negative impact.

The same layer in the waterproofing process requirements will do grass-roots clean-up, yin angle need to do arc treatment, water does not leak seal, new and old wall sewing mesh cloth

In the waterproof control point requires the threshold to use a water-stopping belt brush waterproof, waterproof brush to the dry area (walkway) and turn 30MM,ground leakage position  processed into a funnel-like, shower room water belt and so on.

But waterproofing engineering is a systematic project, design, materials, construction, management of these aspects will have an impact on the quality of waterproofing.

After analyzing the waterproof breakdown, here’s a summary with you:

05

Support for technical expertise

1, the application of 3D scanning technology

The point cloud display after the scan file is imported into the REVIT software.

Through the software synthesis is very intuitive to find the field structure and floor to highlight the decorative design finish surface.

2, lighting design

Lighting is one of the important components of commercial space, effective lighting design can attract and guide the eyes of consumers, to create a comfortable, safe and harmonious lighting environment. Through the creation of each space light environment and consumers to communicate emotional exchanges.

3, theuse ofBIM system

Collision check: Refers to finding and reporting conflicts between different parts of an engineering project in advance.

Collision points Hard collision and soft collision (gap collision) two kinds, hard collision refers to the cross-collision between solid and solid, soft collision refers to the actual collision between solids, but the spacing and space can not meet the relevant construction requirements.

Pre-check the problem and pay attention to checking the site height

Left:2830,right:2840

Required top height:3000 plus construction space

Multi-line BIM collision simulation in smallpox

4, the use of remote monitoring

06

The total package is managed in conjunction with the management

Organizational structure

1, project resource integration

This project involves structural transformation, air conditioning, fire protection, strong and weak electricity, water supply and drainage and other supporting projects. Division I will be decorative general contracting status of the active integration of professional resources, to determine the following points:

2, professional docking

Total package single-bit set eight one-room, our department also set the corresponding responsible person docking, specific docking content see the table.

3, coordinate subcontracting

Under the unified management of the total package, other subcontracting orders are required to complete the construction task according to the hardcover construction node,  and to line up the pipeline according to my mandatory positioning point.

07

Construction progress, quality, safety control ideas

The whole process of using our company’s management system to organize the construction, the management system detailed construction process is divided into several stages, for the progress, quality, safety aspects of each phase of the work of the control focus and methods listed analysis, to ensure that the construction process clear thinking.

1, project safety and civilized management

First of all, it is necessary to clarify the actual situation of the project; Each project varies depending on the volume/nature/category/security   objective requirements of the   project, so the way/methods of security management  vary for different projects. It is particularly important to configure a reasonable security management team according to the actual situation of the project, to clarify the rights and responsibilities, to carry out zoning management/focus management, and to clarify the safety objectives of the common project, so as to achieve “zero accident”.   

We should comb the key points and difficulties of project safety and civilization management according to the actual situation of each project.

To develop strict security planning; Including the security organization’s structural responsibility, the establishment of security management organization, full participation in security planning, everyone in the security management, responsibility to people;     

Break down the key points of security planning: include

(1),fire operation;(2),climbing operations;(3),full ofscaffolding;(4),implementmanagement;(5),temporaryelectricity;(6),civilized construction; and other work of the specific arrangements and responsibilities.

The work and supervision of various safety management work on the construction site are clearly carried out and the procedures and methods are clear.

In short, the core of safety construction management is to improve the management of human consciousness, in the premise of safety planning is the most important implementation.

2, project progress management

“532” management ideas (grain and grass first, before not after)

“532” management ideas, specifically:

“5” – Treat every project as a job grab

All grass-roots and covert construction is completed, at least 50% of latex paint has been finished, with the next process such as stone, wallpaper, wood finish construction.

All surface material orders are completed (except for the replacement list), wood, stone and other major surface materials began to partially install

“3” – order in advance, to ensure the processing cycle

Backfield wood and stone and other products processing can only generally account for about 30% of the total duration, in order to control the quality of processing, it is necessary to ensure a reasonable processing cycle, and ensure its necessary operational continuity, so it is necessary for the project department to place an order in advance, do a good job of prior communication, remove obstacles, such as design, material confirmation, line, order, bidding process.

That is to say, our stone, wood finish, stainless steel and other back yard processing products, must start in the middle and late stage, the basic completion of the middle and late period. Here 30% of the processing time can not be compressed, that is, the previous mention of the snatch order can not rob processing truth.

“2” – eye the backfield, ranking order, quality assurance

Understand as the workload, not the time period, the installation period basically from the middle start, the end of the middle and post-phase stage, the installation cycle should be roughly equivalent to the processing cycle, but the input of human resources is different; Guan Jian is at this time the site grass-roots need to be completely finished products, and with the relevant technical personnel to enter the back yard, to ensure processing progress, supervision of processing order, to ensure that each wholesale goods are qualified products.

3, project quality management

Why is quality management in management?

85% of quality management comes from managers, and project managers need to be active as a team member to ensure that team members comply with the rules and processes associated with project management and use this as an opportunity to create a “quality-seeking”  work  environment.

Regarding project quality management, we have selected some content for you to consult in previous articles.

Five-step line-out method

Recommendations

Quality of common diseases and prevention

When we accept the construction decoration project, the quality standard of the first project must meet the national decoration acceptance specifications, at the same time to meet the enterprise acceptance standards. Decorative enterprises to “fine”,    “fine” as the quality of the soul, leading, every detail, each node is strive for perfection.

08

The company’s service support for the project

High-quality design service team

For this project, the company will set up a professional deep design team, relying on deep professionalism and long-term practical experience, from a professional point of view, actively cooperate with the original design to do a good job of drawing deepening. Can be very good for the owners to provide deep-level design services.

Advanced project management team

The company has a number of people registered first and second-level builders, project managers team, for each project to provide adequate performance and quality of personnel assurance. Over the years, the company has formed a sound construction management system, “productized decoration” and scientific “project management”  of the use of our project is a strong guarantee of success.

Adequate labour security

Division I has a long-term cooperation team, adequate human resources. At the same time, according to the site situation in a timely manner to supplement, to ensure that the construction requirements of the project.

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.

12345