隐私权政策

Hotel Design Management – Objectives, Content, Measures, and Reviews for each phase of Hotel Design Management (3).

Hotel Design Management – Objectives, Content, Measures, and Reviews for each phase of Hotel Design Management (3).

The hotel owner’s approach to hotel design management

Third, the construction drawing design stage

Manage goals

Through the process control of construction drawing design, the design unit is prompted to submit design documents that conform to the contract quantity and quality according to the time stipulated in the contract, meet the specification requirements, and can guide the construction. Control the construction drawing budget does not exceed the design estimates.

Manage the content

(a) Assisting employers in entering into construction drawing design contracts.

(b) Preparation of management rules for the design phase of construction drawings.

(c) Review the qualifications and manpower arrangements of key personnel participating in the design of the drawings, make adjustment proposals, and submit relevant reports to the employer if necessary.

(d) Review the construction drawing design schedule and submit an audit opinion to the employer for approval and implementation.

(e) Track the implementation of the design progress and make relevant comments and requests.

(f) Track the availability of design strength (including a number of personnel and qualifications) and, if necessary, make adjustments.

(g) Follow-up checks to see if the specification version of the drawing design is controlled and whether the construction drawing design meets the contractual and controlled specification version.

(h) To assist employers in providing the basic information, basic data, and external conditions required for the design of construction drawings. If necessary, a qualified regulatory body or an expert shall be entrusted with the demonstration of important design basic information and data, and the relevant management departments shall be requested for approval and use.

(i) Inspection and acceptance of construction drawing design documents.

(j) Sign the opinion on the allocation of design fees.

(k) (Assist employers to commission qualified review bodies to review construction drawing designs.)

(l) A phased summary.

(m) After the examination of the construction drawing, assist the employer to obtain the starting permit according to this and the necessary documents.

Key management measures

(a) Organization of architectural, structural, mechanical and electrical, environmental and energy conservation, cost, legal expert consultants to participate in the management of the Design Management Department.

(b) Organizational Design Management personnel learn and understand the design contract, identify the key points and difficulties in the execution of the contract, conduct risk analysis of the contract, propose a plan to prevent risks, and report it to the employer.

(c) Review the design schedule of the design unit, make adjustments to the overall project progress network, and submit it to the employer for approval and implementation.

(d) In accordance with the rules for the management of construction drawings, the division of functions, staffing arrangements, and job responsibilities of the department’s institutions are clearly defined.

(e) Collection of information required for the design of construction drawings: preliminary design documents and approvals, planning and design conditions, land planning permits, engineering construction planning permits, fire protection, civil defense, transportation, garden approval opinions, municipal, hydropower, gas, heat, communication design agreements and conditions, detailed survey reports and demonstration opinions of major equipment orders, hydrological and engineering geology, project life and load value demonstration opinions, seismic intensity demonstration opinions, planning red lines, coordinates, etc.

(f) Chair a design phase management meeting where the employer clearly defines the scope and responsibilities of the design management department, which proposes management content, methods, and requirements to the design unit.

(g) During the follow-up inspection process, complete the designed tracking management form, make detailed records of the findings, treatment plans, rectification results, and report them to the employer for the record.

(h) The implementation of limit design requires that professional designs do not break through the unit engineering estimates. If there are changes in the design of each profession, they should fill out the initial design change form, list the basis and reasons for the change, and report the increase or decrease of investment after the change to the employer for approval and implementation. Where there are major changes to expand the scale, raise the standard, change the function and add new items, the Design management department shall submit them to the employer for approval and submit them to the investment department for approval.

(i) The Design Management Department holds a weekly design coordination meeting with the participation of the employer, the design unit, checks the design progress, coordinates the resolution of existing problems, and submits the monthly work report to the employer.

(j) After the completion of the drawing design, organize the employer, the design unit, and the relevant collaborative unit to inspect and accept the construction drawing design.

(k) To assist employers to entrust qualified regulatory bodies to review the design of construction drawings and obtain a visa for the examination of construction drawing designs.

(l) In the work of the Design Management Department, we should take the initiative to communicate with the employer, timely transfer of design information, so that the employer grasps the design dynamics, the requirements, and opinions of the employer should communicate with the design unit in a timely manner, research, and implementation. We should fully consult with the employer, reach an agreement, to ensure that the design unit caliber is consistent, conducive to the smooth progress of project management.

(m) Coordination with the competent departments of fire protection, civil defense, transportation, environmental protection, municipalities, and so on in the process of construction drawing design should be actively communicated, reported in a timely manner, and the opinions and requirements of the competent departments on the design should be carefully listened to, which is conducive to the approval of the construction drawing design by the competent departments.

The objectives, content, measures, and evaluation of each stage of hotel design management are divided into (1) to (4), respectively, the design stage, the initial design stage, the construction drawing design stage, and the professional design stage, please pay attention to the content.

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.

12345