Privacy Policy

Listed property company engineering to undertake the full version of the inspection manual

Listed property company engineering to undertake the full version of the inspection manual

The first part  undertakes the inspection process

1. GT-ZY-FZ-001 Takes over the pre-delivery pre-project readiness responsibility allocation form – 1 –

2. GT-BF-GC-001 Property To Undertake Inspection Management Measures – 16 –

3. GT-ZY-GC-009 Takeover Property Needs to Hand Over Information List (Template)- 33 –

Part II  To undertake inspection guidelines

1. GT-ZY-GC-001 distribution system facility equipment to undertake inspection operation guidelines – 39 –

2. GT-ZY-GC-002 Water supply and drainage system facility equipment to undertake inspection operation guidelines – 44 –

3. GT-ZY-GC-003 Building and Hardcover Repair System To undertake inspection operation guidelines – 49 –

4. GT-ZY-GC-004 HVAC facilities equipment to undertake inspection operation guidelines – 68 –

5. GT-ZY-GC-005 Fire System Facility Equipment to undertake inspection operation guidelines – 74 –

6. GT-ZY-GC-006 Elevator and Lift System Facility Equipment To Undertake Inspection Operating Guidelines – 77 –

7. GT-ZY-GC-007 Security and Weak Power System Facility Equipment To Undertake Inspection Operating Guidelines – 79 –

8. GT-ZY-GC-008 Human Defense System Facility Equipment to undertake inspection operation guidelines – 84 –

9. GT-YJ-016 Delivery Contingency Plan – 89 –

Part III Records form

One  takes over the acceptance handover form

1. GT-R-GC-001 Takeover Property Transfer Information List – 97 –

2. GT-R-GC-002 Takes Over Property Without Handing Over Details Schedule – 98 –

3. GT-R-GC-003 Common Facilities Equipment System Handover Schedule – 99 –

4. GT-R-GC-004 Takeover Acceptance Facility Equipment Legacy List – 100 –

5. GT-R-GC-005 List of Transfer of Equipment Information for Common Facilities – 101 –

6. GT-R-GC-006 List of Spare Parts for Common Facilities Equipment – 102 –

Second, the owner’s internal inspection form

1. GT-R-GC-007 Rough Room One Room One Inspection Form – 104 –

2. GT-R-GC-008 FineLy renovated room One room One inspection form – 108 –

3. GT-R-GC-009 Private Pool Checklist – 114 –

4. GT-R-GC-010  Automatic Spray, Drip Checklist – 115 –

5. GT-R-GC-011 Outdoor Gas Grill Checklist – 116 –

6. GT-R-GC-012 Outdoor Kitchen Equipment Checklist – 117 –

Three  common areas to undertake inspection forms

1. GT-R-GC-013 Power Distribution Room Checklist – 119 –

2. GT-R-GC-014 Pump Room Checklist – 121 –

3. GT-R-GC-015 Sewage Pump Checklist – 123 –

4. GT-R-GC-016 Unit Interstation Checklist – 125 –

5. GT-R-GC-017 Unit Foyer Checklist – 127 –

6. GT-R-GC-018 Unit Road Inspection Form – 128 –

7. GT-R-GC-019 Unit Roof Checklist – 129 –

8. GT-R-GC-020 Utility Checklist – 130 –

9. GT-R-GC-021 Public Health Checklist – 133 –

10. GT-R-GC-022 Underground Garage Checklist – 134 –

11. GT-R-GC-023 Fan Room CheckList – 135 –

12. GT-R-GC-024 Fire Facility Equipment Inspection Form – 137 –

13. GT-R-GC-025 Fire Facility Equipment Linkage Test Form – 140 –

14. GT-R-GC-026 Elevator Checklist – 141 –

15. GT-R-GC-027 Elevator Room Checklist – 143 –

16. GT-R-GC-028 Inorganic Room Elevator Checklist – 144 –

17. GT-R-GC-029 Security Facility Equipment Checklist – 147 –

18. GT-R-GC-030 Access Control System Checklist – 149 –

19. GT-R-GC-031 Background Sound System Checklist – 150 –

20. GT-R-GC-032 Human Defense Equipment Checklist – 151 –

Four  other forms

1. GT-R-ZL-003 Incident Investigation and Processing Report – 152 –

2. GT-R-ZHGL-XXX Work Contact Sheet – 153 –

Part IV Property To Undertake Inspection Measures

1. Noun interpretation – 155 –

2. Understanding and application of the Property Acquisition Inspection Measures – 156 –

3. Property to undertake inspection method – 160 –

4. Key interpretation of the provisions of the Property To Undertake Inspection Measures – 166 –

Part V References

1. How to write a defect report – 170 –

2. Quality warranty period table – 171 – for each professional construction contract

3. Fine decoration into the home maintenance management program – 175 –

4. In-house maintenance of finished product protection measures – 182 –

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.

12345