
Aaron profile
I have engineering management experience in real estate, architecture, decoration, design, catering, commercial chain and other enterprises, involving project establishment, preliminary engineering planning, design management, cost management and bidding\Procurement management, the whole process of construction progress, quality, cost, safety, risk control, completion acceptance and other management; And has established and improved the enterprise construction project management standards, standardization system, process system and other related systems and engineering technical data.
Familiar with the construction project planning, overall planning, organization, coordination, implementation, resource docking and whole-process project management of the owner, designer, consultant and constructorPMP, project groupPMOConstruction management; Engaged in decoration designer, civil engineering, mechanical and electrical engineer, project manager, engineering manager, engineering director, etc.
Good communication skills, negotiation skills, cost awareness, strong sense of responsibility, good professional ethics and team work spirit; Proficient in using word 、 excel 、 cad 、ppt、project, Tianzheng, Guanglianda, bidding and other related office and engineering software; There areA2A driver's license.
Project Team management
Project organization and equipment
In general, the organizational structure of the project management team should at least meet the following requirements:
1. Abilities required by the manager of project Management Department: have certain technical foundation and business technical ability; Strong organization, coordination and control, analysis and decision-making, expression and strain, social skills.
2. Project submission team: 1 to 2 people, familiar with project management workflow, master application procedures, strong coordination, expression and social skills.
3. Engineering technology group: it shall be composed of technical personnel specialized in architecture, structure, HVAC, water supply and drainage, electrical, intelligent building, etc., with design experience or familiar with design management.
4. Recruitment and contract management team: 2 to 3 people, familiar with the construction process of the project, bidding and contract laws and regulations, strong organization, expression and social skills.
5. Investment control group: composed of civil engineering, plumbing, electrical cost personnel, should have strong coordination and control, analysis and expression ability.
6. Planning and coordination group: 2 members. Should be familiar with engineering construction process, should have strong organization and coordination, strain and control ability.
7. Integrated Administration Group: 2 to 3 people, consisting of data and information management personnel and other personnel. Data and information management personnel should be familiar with the construction process and data management regulations.
Project Covers
Navigation
A recent article
- 分布式光伏居间人需要了解居间工作的内容
- 五星级酒店工程部组织架构岗位职责及管理制度
- 高压电、低压电及强电和弱电的区分
- 建筑、装饰、安装、市政、园林造价工程量清单及计算规则
- 公司工程部与工程项目部的关系
- 公司工程管理中心与项目部职能职责界定
- 18D7052电动汽车充电基础设施设计与安装GB509662014电动汽车充电站设计规范
- 甲方出难题,施工方如何应对
- 签订施工合同注意事项
- 疫情之下,建设工程中发包单位的应对措施
- 万科项目工程管理策划书编制指引
- 工程造价㎡汇总表,各种指标一目了然!
- 土建工程的这28个工种
- 常用造价材料用料核算数
- 建设工程造价鉴定规范-GBT51262-2017
- 建设工程工程量清单计价规范-GB50500-2013
- 《民法典》是怎么规定建设工程合同12个问题
- 餐饮企业食品分类和各类许可要求
- 中央厨房、集体用餐配送单位审查标准
- 粗加工场所设计标准、通俗解读、示范图纸、参考范例。
- 餐饮厨房设计标准——餐用具清洗消毒场所设计标准及示范图纸
- 餐饮厨房设计标准——糕点类食品制作场所设计标准及示范图纸
- 餐饮厨房设计标准——烧腊制作场所设计标准及示范图纸
- 中央空调风管清洗施工方案
- 中央空调施工现场工序质量管理要点
- 安监部门,在工地会检查哪些项目或隐患?
- 质监站下工地必查的项目
- 造价知识全整理