Early Property Management Risk Identification and Prevention Guidelines

Early Property Management Risk Identification and Prevention Guidelines

The project investigates the risk phase

Zhou border security situation research is not detailed;

Peripheral consumption, the same (similar) business situation;

Information on the mobile population and human resources;

factors that affect the owner’s life;

Project local policy research;

Security management

A falling object at high altitude

steal

Live fights

Foreign forces affect the normal order

On-site security precautions

Electric shock hurts people

Fire management

The fire caused by the line

The construction fire caused the fire

The equipment room is leaking

An open fire

A fire caused by overload

Fires in flammable and explosive materials

Public environment

Clean up the wasteland

Geo-stone mirror treatment

Danger zone tips to make

Guide system production

The preparatory phase of the project

The establishment of management system documents

Personnel training

Supplier library establishment

The signing of various types of outsourcing contracts

Material preparation and supplementary procurement

All kinds of major node preparation (e.g. opening, joining, etc.)

Establishment of various types of archives (engineering files, daily records files, customer files, contract files, etc.)

Contingency plans are built on drills

Construction, installation phase

There is no hidden engineering acceptance record

There is no record of closed water testing for waterproofing works

There are no construction records in the construction that do not match the drawings

Record of safety hazard rectification found in construction

I don’t know the performance of the device

Do not understand the equipment maintenance points record

Take over the acceptance phase

No property rights information was transferred

There is no transfer of engineering technical information or incomplete transfer

No equipment was handed over to records, or the handover was incomplete

There are no maintenance contracts of all kinds, and no written information

There is no record of this experience

There is no solution to the project legacy issues

The corresponding customer information

Plan the design risk, drawing review stage

The water feature setting is not reasonable

The selection of skit materials is not conducive to later maintenance;

Property body details are not in place, affecting later use

The setting of traffic flow and traffic route

The reasonableness of parking spaces and supporting settings and whether they meet the requirements for use and expansion needs

Intelligent engineering settings

Whether the device room settings are reasonable or not, and whether the function of use can be satisfied

Whether the configuration of the management room is reasonable

Pool, landscape safety hazard tips, preventive measures

The design rationality of rainwater, sewage and smoke removal system

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.